The west main bridge approach
The west main bridge approach of Nan Pu is 1820.72m long,The construction technology of cover beam obtained the second prize for science advancement in Shanghai and the third prize for science advancement in the Ministry of Construction.Construction.Construction craft and whole set technology won the special award by Shanghai Goverment and won Shanghai 'White Magnolia'.
|
The No.6 bidding section of Nanpu bridge
The pier of its main approach applied a large cantilevering, hollow structure of heavy reinforced concrete and "T" Shape of beam. The project won the Shanghai "White Magnolia","Model Project" of the Ministry of "Construction and "zhan tianyou" in the first turn.
|
The No.7 bidding section of Xupu bridge
About 1000 meters long, large fair-faced concrete pre-cast component, the project won the National Municipal "Golden medal".
|
The main bridge approach of Lupu
The upright beam is 39.31m inheight, The largest span of "T" shape beam is 40m and the most heavy is 98 T.
|
|
|